top of page

Town of Wakefield

Wakefield Memorial High School

CM

BOND Building Construction

Architect

SMMA

Cost

$220,500,000

Size

260,027 SF

Project Description

LeftField was hired by the Town of Wakefield for the new Wakefield Memorial High School Feasibility Study along with SMMA, the selected Designer.  At the beginning of Schematic Design, BOND Building was procured as the Construction Manager for the project and brought on early to assist with developing the Project Budget, Schedule and Construction Logistics.  After the project was voted to move forward in early 2023, the Project Team began work on the design and construction of a new high school on the existing football field and track which will allow school operations to be maintained throughout construction.  After the completion of the new school, the existing school will be demolished and the football field and track with be replaced.

KEEP BROWSING OUR PORTFOLIO

The Right Choice in Project Management

ABOUT

As an industry leading owner’s project management firm invested in its people, we combine our advanced technical abilities and keen social awareness with ingenuity and collaboration to create successful outcomes for our clients. 

  • LinkedIn
  • Instagram
  • Twitter

© 2023 Leftfield Project Management.

Site by PARLR Brand Studio.

CONTACT

info@leftfieldpm.com

 

101 Federal Street, Suite 1900

Boston, MA 02110

617 737 6400

10 Dorrance Street, Suite 700

Providence, RI 02903

401 519 3848

255 Park Avenue, Suite 1000

Worcester, MA 01609

508 797 3037

1087 Elm Street, Second Floor

Manchester, NH 03101

603 854 5201

bottom of page