top of page

Akoya BioSciences

500 Donald Lynch Blvd

CM

Dube Construction Management

Architect

iKAHN and J Ferrera Associates Inc.

Cost

$1,730,000

Size

5,400 SF (2 Phases)

Project Description

LeftField was selected to manage the planning, design, and construction of a two-phase renovation project at 500 Donald Lynch Bld, Marlborough Ma.  The project team included iKHAN Architects, J. Ferrera Associates, Vanderweil Engineers, CMTA, Inc., Cummings Engineering and Dube Construction Management

 

Phase 1 included a 1,400 SF walk-in cold room by Control Environment Systems, as well as an office to lab conversion that included a new QC Lab and two new manufacturing suites.  Phase 2 continued the office to lab conversion efforts and provided a new R&D Lab, Manufacturing Instruments Lab, two additional manufacturing suites, and a tech. support suite.

KEEP BROWSING OUR PORTFOLIO

The Right Choice in Project Management

ABOUT

As an industry leading owner’s project management firm invested in its people, we combine our advanced technical abilities and keen social awareness with ingenuity and collaboration to create successful outcomes for our clients. 

  • LinkedIn
  • Instagram
  • Twitter

© 2023 Leftfield Project Management.

Site by PARLR Brand Studio.

CONTACT

info@leftfieldpm.com

 

101 Federal Street, Suite 1900

Boston, MA 02110

617 737 6400

10 Dorrance Street, Suite 700

Providence, RI 02903

401 519 3848

255 Park Avenue, Suite 1000

Worcester, MA 01609

508 797 3037

1087 Elm Street, Second Floor

Manchester, NH 03101

603 854 5201

bottom of page