top of page

Town of Tyngsborough

Tyngsborough Middle School

CM

Fontaine Bros., Inc.

Architect

JCJ Architects

Cost

$83,480,000

Size

112,748 SF

Project Description

LeftField was hired to manage the feasibility, planning, design, and construction of Tyngsborough Middle School, currently under construction and scheduled for completion by 2026. Once completed, Tyngsborough’s middle school learners will have a new two-story, 112,784-square-foot facility equipped with state-of-the-art technology and cutting-edge equipment. The new school is designed to accommodate 480 students spanning grades 6 through 8, with the inclusion of district offices within the building. While the classroom wings will be dedicated to the core educational curriculum, the central core of the building will house communal areas such as the cafetorium, media center, gymnasium, flexible performance space, and administrative offices. Additionally, the new middle school is being constructed on the existing site, which is shared with the Tyngsborough High School. Outdoor amenities include outdoor courtyards tailored for both educational and recreational activities, featuring a softball field and a canopy facilitating student and staff movement between the two schools.

KEEP BROWSING OUR PORTFOLIO

The Right Choice in Project Management

ABOUT

As an industry leading owner’s project management firm invested in its people, we combine our advanced technical abilities and keen social awareness with ingenuity and collaboration to create successful outcomes for our clients. 

  • LinkedIn
  • Instagram
  • Twitter

© 2023 Leftfield Project Management.

Site by PARLR Brand Studio.

CONTACT

info@leftfieldpm.com

 

101 Federal Street, Suite 1900

Boston, MA 02110

617 737 6400

10 Dorrance Street, Suite 700

Providence, RI 02903

401 519 3848

255 Park Avenue, Suite 1000

Worcester, MA 01609

508 797 3037

1087 Elm Street, Second Floor

Manchester, NH 03101

603 854 5201

bottom of page