top of page

City of Fall River

BMC Durfee High School

CM

Suffolk Construction

Architect

Ai3 Architects

Cost

$263,000,000

Size

500,000 SF

Project Description

LeftField was selected as the OPM for Fall River’s more than 500,000 sf BMC Durfee High School project. The massive high school was constructed on the site of the former high school that housed a student population of 2,600. There are 10 approved Chapter 74/CVTE programs and 2 additional programs seeking approval.


The new school wraps around the existing football stadium and ties into the existing field house we are currently renovating in phases to allow its continued use. The new school was sited to avoid ledge and wetlands to the extent possible but required an extensive site program for boulder removal, utility relocations and extensive site drainage structures that began between the Schematic and Design Development Phases. This was to prepare the site for early concrete and steel bid packages that aligned appropriately with design and the best calendar months for concrete.


“Starting the complex site work early allowed for an accelerated completion a year earlier than anticipated.” – Jim Rogers, Founder of LeftField

Due to the existing school, athletic fields and parking, the remaining open area for construction was tight, so site logistics were continually changing to accommodate school operations and construction. Our onsite presence had helped coordinate, communicate, and manage these continual changes with minimal impact to school operations. LeftField also strived to engage the students in the process and sought their involvement from the beginning at visioning sessions and in using their expertise in social media to design/manage the project website, Instagram and Twitter accounts.


Being active in the school and community and encouraging a collaborative process provided a positive experience for all.

KEEP BROWSING OUR PORTFOLIO

The Right Choice in Project Management

ABOUT

As an industry leading owner’s project management firm invested in its people, we combine our advanced technical abilities and keen social awareness with ingenuity and collaboration to create successful outcomes for our clients. 

  • LinkedIn
  • Instagram
  • Twitter

© 2023 Leftfield Project Management.

Site by PARLR Brand Studio.

CONTACT

info@leftfieldpm.com

 

101 Federal Street, Suite 1900

Boston, MA 02110

617 737 6400

10 Dorrance Street, Suite 700

Providence, RI 02903

401 519 3848

255 Park Avenue, Suite 1000

Worcester, MA 01609

508 797 3037

1087 Elm Street, Second Floor

Manchester, NH 03101

603 854 5201

bottom of page