top of page

Town of Billerica

Pinehurst Fire Station

CM

Hutter Construction

Architect

Winter Street Architects

Cost

$10,000,000

Size

11,100 SF

Project Description

LeftField was selected as the OPM for Billerica, Massachusetts’ Pinehurst Fire Station. The new fire station includes a decontamination area for emergencies involving hazardous materials, a walk-in medical services room and several training facilities. The new buildings include integrated daylighting systems driving a combination of sunshades, light shelves and rooftop light monitors to provide daylight deep into building areas, greatly reducing electrical usage and helping the project meet its sustainable goals.


The Fire Station, which was constructed on the site of the existing Fire Station, operates 24 hours a day so during construction the Firefighters and their fire apparatus were relocated to a temporary location.

KEEP BROWSING OUR PORTFOLIO

The Right Choice in Project Management

ABOUT

As an industry leading owner’s project management firm invested in its people, we combine our advanced technical abilities and keen social awareness with ingenuity and collaboration to create successful outcomes for our clients. 

  • LinkedIn
  • Instagram
  • Twitter

© 2023 Leftfield Project Management.

Site by PARLR Brand Studio.

CONTACT

info@leftfieldpm.com

 

101 Federal Street, Suite 1900

Boston, MA 02110

617 737 6400

10 Dorrance Street, Suite 700

Providence, RI 02903

401 519 3848

255 Park Avenue, Suite 1000

Worcester, MA 01609

508 797 3037

1087 Elm Street, Second Floor

Manchester, NH 03101

603 854 5201

bottom of page